NIMBUS 1 - PROTOTYPE CASING PACKAGE rev0.7 FINAL (2026-08-09) ============================================================== Canonical decisions & full history: "Nimbus Unit 1 - Enclosure, Power & Order Brief" on The Cloud. The package zip is the complete vendor/engineer handoff. SHELL rev0.7 EXACT PARAMETERS ----------------------------- Envelope 220 x 220 x 100 mm - corners R26 - top edge R7 - bottom rim R3 Walls 4mm (above z=8) / 6mm below z=8 forming plate socket ledge Cloud mark: smooth-spline deboss 0.5mm deep, 80mm wide, top center Rear aperture 168 x 48 mm tangent-to-tangent, z 26-74 4x M4 rear post pilots at (+-76, z 19 & 81) 4x integral corner columns: 14mm wedges at (+-99,+-99), z 8-96, SMOOTH rails 4x M3 foot threads at (+-96,+-96), 14mm deep, in column feet Socket: opening 208.0mm; plate/net 207.2mm (0.4mm/side); seats at ledge z=8 VERIFIED: volume 510.9 cm3 - probe audit 13/13 - DXF entity audit passed (1 outline polyline / 72 lines / 72 arcs / 4 circles) ASSEMBLY (no tools inside cavity, ever) --------------------------------------- Sled (engineer part, bent 5052): channels lined 1.5mm silicone, slide down columns. Face-down: net/plate nests in socket; 4x M3 up through net -> washer -> sled flange -> washer -> column foot. Rubber-cap heads = feet (protrude ~2mm below rim; rim floats). Full elastomer chain: board grommets -> lined channels -> washered joints -> rubber feet. SLED REQUIREMENTS (engineer) ---------------------------- Mini-ITX standard standoff pattern (modularity law: shell outlives the board). SSD/fan/PSU each swappable without disturbing others. Slotted PSU bracket. 92+120mm fan patterns. Clip antenna mounts. Screws+connectors only. Channel inner dim = 14mm column + 2x1.5mm liner + fit clearance. AIRFLOW / POWER --------------- Bottom in (net or plate slot ring) -> 120mm fan -> rear out. Draw @120V: idle ~0.1A - typical 0.5-0.9A - full ~1.3-1.4A - peak ~1.7A. 150-170W sustained design point at 35C ambient, 400W PSU (2x headroom). GATES BEFORE PRECISION METAL ---------------------------- Donor bench measurement -> 3D-printed fit gate -> anodize coupons (Blue Box blue vs storm navy + gloss-in-recess mark) -> vendor first article. OPEN ITEMS (owned/gated, none blocking orders) ---------------------------------------------- 1. Sled fab-final CAD - engineer, after donor measure 2. Headless Wi-Fi onboarding spec - MachineSync (Ethernet-first Unit 1) 3. Radio-through-shell RSSI test - validation week 1 4. Anodize coupons + mark gloss method 5. Dedication etch artwork + serials - at plate production